Machine tool loading and unloading project of a certain processing factory


Release time:

2025-09-24

Material arrival - robot grasping and loading - surface changing and processing - unloading. Project difficulty: The clearance between the chuck and the fixture is small.

Material arrival - robotic grasping and loading - surface changing and processing loading - unloading.

Project difficulty: The clearance between the chuck and the public building is small.                    

■ SKU quantity: 1 type  ■ takt time: approximately 60 seconds per piece  ■ location: Tianjin

Previous:

:Next

Previous:

Next: