Machine tool loading and unloading project of a certain processing factory
Release time:
2025-09-24
Material arrival - robot grasping and loading - surface changing and processing - unloading. Project difficulty: The clearance between the chuck and the fixture is small.
Material arrival - robotic grasping and loading - surface changing and processing loading - unloading.
Project difficulty: The clearance between the chuck and the public building is small.
■ SKU quantity: 1 type ■ takt time: approximately 60 seconds per piece ■ location: Tianjin